R&V Engineering has developed a stand-by burner

STAND-BY BURNER. The R&V Engineering stand-by burner provides fuel and electrical energy savings at low investment costs.

At power plants, refinery’s and other industries with critical steam consumers, auxiliary boilers may need to be kept in stand-by mode. In this way, sudden changes in steam demand can be compensated or advantage can be taken from flexible electricity prices.

Keeping a boiler in stand-by mode is often energy consuming, especially when the boiler is designed for continuous operation. Those burners have a limited turn-down ratio. The resulting minimum burner load is higher than needed to keep the boiler hot. The surplus of heat is wasted.

To deal with this problem, R&V Engineering has developed a stand-by burner. The stand-by burner consists of a O-shaped tube that will be integrated with the (existing) burner. The burner meets the boiler stand-by mode heat demand exactly. This stand-by burner operates with auxiliary air only replacing the regular combustion air flow. Also the low excess air level of 10% contributes to energy savings.

The stand by burner can be combined with the earlier introduced Low NOx modification kit.

For more information please contact our sales team at +31 10 446 9222 or info@dejong.nl.

Vergelijkbare nieuwsberichten

Nieuwsoverzicht

Ruim twintig werknemers starten ontwikkeltraject bij onze A. de Jong Academy

24 januari 2022

Maar liefst 21 werknemers van de A. de Jong Groep zijn genomineerd om in 2022 hun kennis te verbreden via onze Academy. Tijdens de kick-off vlak voor de kerstvakantie committeerden zij zich aan twee van onze opleidingen die in januari van start zijn gegaan. De A. de Jong Academy biedt tot halverwege 2022 twee verschillende […]

Lees meer

Project 56.000 met Kai Reus

21 december 2021

Één fiets, één wielrenner en één uur Soms zijn er projecten waar je je ziel en zaligheid in stopt. Omdat het vernieuwt, innovatie ademt en een flinke uitdaging is. Zaken die passen bij het DNA van A. de Jong Groep. Dus toen oud-wielrenner Kai Reus in maart 2018 bekend aangaf zijn rentree te maken, zaten […]

Lees meer

Optimaliseren binnenklimaat scholen Vlaardingen

16 december 2021

Op naar achttien frisse scholen in Vlaardingen! In opdracht van de gemeente Vlaardingen optimaliseren wij in twee jaar het binnenklimaat van maar liefst achttien (!) scholen in het primair- en voortgezet onderwijs. Hierbij moet onder andere worden gedacht aan het verbeteren van de luchtverversing, het renoveren van de sanitaire voorzieningen en natuurlijk het vervangen van […]

Lees meer

De Jong Combustion has been awarded

2 juli 2021

De Jong Combustion b.v. (DJC) has been awarded an order to upgrade two boiler installations to low NOx technology at a Center European chemical plant. Both 10 t/hr steam boilers have been in operation since 1986 using DJC old model burners to the satisfaction of the customer, however they were no longer meeting the emission […]

Lees meer

R&V Engineering has developed a stand-by burner

23 april 2021

STAND-BY BURNER. The R&V Engineering stand-by burner provides fuel and electrical energy savings at low investment costs. At power plants, refinery’s and other industries with critical steam consumers, auxiliary boilers may need to be kept in stand-by mode. In this way, sudden changes in steam demand can be compensated or advantage can be taken from […]

Lees meer

Safety Integrity Level

25 januari 2021

DJC/R&V regularly execute Safety Integrity Level (SIL) verification studies for the safety functions which are embedded in our burner systems. Now, DJC/R&V offer these important studies also as a separate service. These studies are executed by DJC/R&V’s TüV certified Functional Safety Engineers. The SIL-level of a safety integrated function (SIF) is determined during a Layer […]

Lees meer

A. de Jong Group has joined Platform 6-25

12 november 2020

As of November 10th , A de Jong Group has joined Platform 6-25. Platform 6-25 is an initiative from FME and VEMW to help the Dutch industry meeting its carbon emissions reduction targets by realizing 6 million tonnes CO2 emission reduction in 2025. The platform offers the industry technology solutions, services and support in financing […]

Lees meer

A. de Jong Groep is aangesloten bij platform 6-25

Sinds 10 November heeft de A. de Jong groep zich aangesloten bij platform 6-25. Platform 6-25 is een initiatief van FME en VEMW om de industrie in Nederland te helpen om 6 miljoen ton CO2 te besparen in 2025. Dit wil het platform bereiken door het aanbieden van CO2– en energiebesparende technieken en diensten maar […]

Lees meer

Gas Pressure Reducing Station. One stop shopping at De Jong Combustion and R&V Engineering!

2 oktober 2020

At many factory sites, fuel is available (very) high pressures. Where Gas Turbine sets and conventional or duct burners are working on (much) lower pressures, for various reasons. A Gas Pressure Reducing Station (GPRS) is normally required to reduce the fuel pressure for various consumers. At DJC/R&V we have a long history with the design […]

Lees meer